What Is Caliche, and How Do You Dig Through It?
If you've ever put a shovel in the ground in the North Valley and had it bounce back at you, you've probably met caliche. It's one of the most common things we run into on lots around Cave Creek, New River and Desert Hills, and it affects more of a building project than most people expect. Here's what it is, how to tell when you've hit it, and how we dig through it.
What caliche is
Caliche is soil that's been cemented together by calcium carbonate. Basically, it's natural cement.
It forms slowly. Rain carries calcium down into the soil, and over a very long time it builds up and hardens into solid deposits. Sometimes that means loose, chalky lumps mixed into the dirt. Sometimes it's a solid layer anywhere from a few inches to several feet thick, and the hard layers can be close to rock.
How to tell you've hit it
There are three signs we see over and over:
A chalky white or cream-colored layer showing up in the side of a hole or trench.
A shovel that bounces instead of going in.
Water that sits and won't drain. If a hole fills with water and stays full, there's a good chance something tight is underneath.
What caliche affects on your project
Caliche can show up anywhere on a lot, but it matters most in three places.
Footings and your building pad. A building pad has to be cut, leveled and compacted, and footings have to go down to depth. When there's a hard layer in the way, that work takes different equipment and more time.
Utility trenches and pools. Trenches for water, power and gas lines run across a lot of ground. A pool goes deep. Both are likely to cut through caliche if it's there.
Your septic system. This is the one that surprises people. A septic system depends on water soaking down through the soil, and water can't soak through a tight caliche layer. Arizona's septic rules require a site investigation that looks at the ground about 12 feet down. A solid layer in that zone can mean you need an alternative system instead of a conventional one. That's a big difference in design and cost, so it's much better to know early.
How we dig through caliche
There's no single method. We match the method to the layer.
Softer caliche can be ripped with a ripper tooth.
Hard caliche takes a hydraulic hammer.
Thick, massive layers may need controlled blasting.
On a lot of jobs it's a mix. A few feet of soft material on top, then a hard band, then softer ground again underneath. That's why we like to see what's actually down there before anyone commits to a plan.
Our advice: dig test holes before you design
If you're planning to build, put in a pool, or install a septic system, dig test holes first. Find out where the caliche starts and how thick it is before you set your pad, lay out your trenches or design your septic.
It's a small step that can save you from a redesign, a surprise change order, or a septic plan that has to be redone after the ground has already been opened up.
J-King Excavation has been working Arizona's caliche and rocky ground for over 40 years, from building pads and trenching to hammering and blasting and septic design and installation. We're bonded and insured, and estimates are always free.
If you're running into caliche, or think you might, give us a call at 623-231-5697 or visit j-kingexcavating.com.





Comments